In 2025, the trend toward more focused Port State Control Inspections (PSCIs) remained strong, while detentions continued to increase, following the pattern observed over the past five years.
The Detention Rate (DER) has been rising annually, once again exceeding the 3% threshold. In 2025, the total DER reached 3.43%, compared with almost 3.0% in 2024. However, 46.1% of PSCIs were completed without deficiencies (Clean Inspections). In total, 75,168 PSCIs were completed in 2025, resulting in 177,741 deficiencies and 2,569 detentions, with DPI (Deficiencies per Inspection) 2.37%.

Overall, Managers and Ship Owners must be thoroughly prepared for upcoming PSC inspections, ensuring strong performance and full compliance with PSC requirements. The challenge of successfully passing these inspections has intensified significantly, with detentions increasingly becoming a factor that can force vessels to suspend trading for one or more days.
This results in substantial losses for shipping companies, as lifting a detention involves significant costs, including rectification expenses, off-hire losses, and reputational damage. Since nearly half of PSCIs end without deficiencies, this demonstrates that effective solutions do exist. Experience has shown that less prepared vessels are far more likely to encounter problems during a PSC inspection.
In this regard, ship owners and managers should treat PSC compliance as a continuous priority.
"Implementing rigorous pre-inspection audits, investing in crew training, maintaining detailed maintenance logs, and addressing minor deficiencies proactively can dramatically reduce the risk of detentions."
Companies that embed compliance into daily operations will not only avoid costly disruptions but also strengthen their credibility with regulators, insurers, and charterers, turning PSC inspections from a risk into a performance benchmark.