From January 1, 2026, S-100 ECDIS will be legal for use, with a transition period until 1 January, 2029, after which all new systems must comply with the updated IMO ECDIS Performance Standards. The S-100 framework marks a step forward by enabling the integration of diverse datasets within a single Electronic Chart Display and Information System (ECDIS).
At its 106th session in November 2022, the Maritime Safety Committee (MSC) of the International Maritime Organization (IMO) adopted resolution MSC.530(106), establishing Performance Standards for Electronic Chart Display and Information Systems (ECDIS). This resolution was subsequently revised by MSC.530(106)/Rev.1 to incorporate route exchange functionality. As revised, resolution MSC.530(106) sets out the following implementation timeline for S-100 ECDIS:
- if installed on or after 1 January 2029, conforms to performance standards not inferior to those specified in the annex to the present resolution;
- if installed on or after 1 January 2026 but before 1 January 2029, conforms either to performance standards not inferior to those specified in the annex to the present resolution or to performance standards not inferior to those specified in the annex to resolution MSC.232(82)
In January 2025, IHO Member States announced they adopted the first set of standards within the S-100 as follows:
- S-101: Electronic Navigational Charts (ENCs)
- S-102: Bathymetric Surface
- S-104: Water Level Information
- S-111: Surface Currents
- S-129: Under Keel Clearance Management
" Adopted in November 2022, the IMO’s revised ECDIS Performance Standards (MSC.530(106)), marked a turning point. For the first time, they established an international regulatory basis for S-100-capable ECDIS to be fitted and type-approved. "
… Tom Mellor, Head of Technical Partnerships at the UKHO commented in a recent UKHO article.
Talking about the timeframe that the IHO Performance Standard establishes for S-100 data, Tom Mellor highlighted the following:
- From 1 January 2026: New ECDIS can follow either the old standard (MSC.232(82)) or the new one (MSC.530(106)). However, it is important to note that S-100-compatible systems are still under development, and the testing standards necessary for type approval have yet to be published, meaning no ECDIS will meet the new standard in the short term.
- From 1 January 2029: All newly installed ECDIS must meet the new standard MSC.530(106) – meaning they must be S-100 compatible. This also applies to retrofits.
- While the regulatory milestones are clear, the transition will take time and global coordination.
Key recommendations
Short term (now – 2026)
Long term (2029 onwards)
- Stay informed by accessing educational resources on S-100 and sign up to S-100 updates for the latest developments.
- If you need to fit new S-57 ECDIS now, talk to your OEM about software upgrades to S-100. Ask if the hardware will be compatible with, and able to run using, S-100 data. The UKHO/Shom will be making data available alongside software for testing.
- Mid term (2026 – 2028)
- Follow industry progress of S-100 sea trials and opportunities for early access to S-100 data.
- Assess when a move to S-100 would benefit your organisation.
- Ensure all new ECDIS installations and retrofits are compatible with S-100 and conform to the latest IMO Performance Standard.
Even after S-100 becomes mandatory, new ECDIS systems will still be able to display today’s S-57 ENCs. This creates a period of ‘dual fuelling’, where mariners can switch between existing S-57 ENCs and new S-100 data for a smooth transition.
UKHO clarifies there won’t be a requirement to replace existing ECDIS. However, any new installations or retrofits that occur after 1 January 2029 will need to conform to the new performance standard and be capable of displaying S-100 data.
When will S-100 ECDIS become available?
A range of ECDIS manufacturers are already developing and testing S-100-compatible ECDIS systems. Based on current timelines, type-approved S-100 ECDIS are estimated to be commercially available to purchase in 2028.
Before then, non-type-approved systems will be available for testing, familiarisation and back-of-bridge use. The UKHO is working closely with multiple ECDIS manufacturers to support this development; this includes testing S-100 in both shore-based environments and live S-100 sea trials to help ensure that future ECDIS are designed to meet the needs of users.